Here at Covenant we believe in taking the Gospel to the world. The Lord has given us favor as a Church and has allowed us to travel around the world sharing our faith and preaching the Gospel as well as bringing food to the Hungry and Clothes for the naked. We have traveled to countries such as Uganda in east Africa, Guyana, South America, India, the northern part of India (Kashmir). that is just to name a few places. Click on the video below and see some of the things the Lord allowed us to do in Uganda. Join us for our next trip to Uganda. if you are interested in going, please contact Pastor Ozzie Bloxson at ozoffwb@yahoo.com

The Video (Children of God) is from our most recent trip. please watch.

If you have stopped by about the building I will replace the video very soon . we need your help. or you can simply call me and I will explain everything to you with no pressure. thank you for your understanding. My heart is passioniate about those children.  850-621-4794

 

PROPOSED BUDGET

 FOR THE

CONSTRUCTION

OF

CLASSROOM BLOCKS

AT

IMANI CHILDREN CENTERS

Contact Person:    Pastor Ozzie Bloxson, Email ozoffwb@yahoo.com, Tel:  850-863-1323 or cell 850-621-4794

PHASES IN THE COURSE OF CONSTRUCTION

This budget covers the foundation, building, roofing, plastering, finishing, to fixing gutters for storm water collection, windows and doors.

CLASSROOMS BLOCKS REQUIRED

The seven school centers, Kitongo requires 7 classroom blocks, Lugazi 7, Kamusenene 7, Lagutu 7, Troas 5, Rwenjiri 4 and Kassanda 4 classroom blocks.

Note:  Each classroom block is equivalent to (25 x 50) feet

SUMMARIZED CLASSROOM BLOCKS COST IN EACH SCHOOL CENTRE

School Centres

Number of Classroom

Each Classroom Cost  (US$)

Total Cost

(US$)

Kitongo

7

30,049.20

210,344.40

Lugazi

7

30,049.20

210,344.40

Kamusenene

7

30,049.20

210,344.40

Lagutu

7

           30,049.20

          210,344.40

Troas

5

30,049.20

150,246.00

Rwenjiri

4

30,049.20

120,196.80

Kassanda

4

30,049.20

120,196.80

GRAND TOTAL

 

 

 

 

 

 

 

 

1,232,017.20

MIXES TO BE USED

1. Mortar 1:4
2. Concrete 1:4:8
3. Floor 1:3:1

 

 

BUDGET SPECIFICTION SHEET FOR A CLASSROOM BLOCK (25X50)ft

ITEM DESCRIPTION

UOM

QTY

UNIT COST

TOTAL COST

(US$)

(US$)

Binding wire

kgs

30

4

120

Bricks

each

30,000

0.15

4,500.00

Brushes

each

5

2

10.00

Cement

bags

350

13.6

4,760.00

Clippers

each

100

1

100.00

Eucalyptus stems

each

60

2

120.00

Face boards

each

15

8

120.00

Filer

pkts

5

1

5.00

Gutters

each

10

12

120.00

Hoes

each

6

5

30.00

Spades

each

6

6

36.00

Digging Tipkacts

each

4

10

40.00

Wheel Barrows

pieces

3

47

141.00

Iron bars

each

95

18

1,710.00

Aggregates

trips

4

150

600.00

Lake sand

trips

12

97

1,164.00

River Sand

trips

10

100

1,000.00

Marum

trips

15

80

1,200.00

Lime

bags

10

10

100.00

Timber

pieces

20

6

120.00

Nails 2 inches

kgs

10

2

20.00

Nails 3 inches

kgs

10

2

20.00

Nails 4 inches

kgs

30

2

60.00

Nails 5 inches

kgs

20

2

40.00

Nails 6 inches

kgs

20

2

40.00

Roofing Nails

kgs

25

3

75.00

Nail cover

pkts

5

8

40.00

Pattie

kgs

50

2

100.00

Payan

rolls

10

34

340.00

Iron sheets

pieces

100

14

1,400.00

­­­­­­­Ridges

each

9

10

90.00

Rings

each

20

5

100.00

Sand Basins

each

10

4

40.00

Sisal Strings

each

5

2

10.00

Steel Doors

each

2

200

400.00

Steel Windows

each

8

140

1,120.00

Roofing poles

pieces

200

6

1,200.00

Vents

each

100

0.5

50.00

Water for Building

ltrs

5000

0.05

250.00

Wood Preservative

jerricans

2

20

40.00

Black board

pieces

4

40

160.00

Empty Jerricans

Each

20

4

80.00

Paint

lumpsum

 

 

817

Gutters

pieces

28

16.7

467.6

Pipes

pieces

8

11.7

93.6

Labor & transport

lumpsum

 

 

7,000.00

GRAND TOTAL

 

 

 

     30,049.20